Ruminating

Going the Right Way

We’ve officially changed course. We’re now planning to hold off finishing the first floor and instead focus on the basement. If we can get the basement floor redone along with the below ground plumbing, we can move into the basement and do the whole second floor at one time, which also lets us do nearly […]

Ruminating

Considering the Right Way

We’re facing a conundrum. We got confirmation from the city that we can pass inspection doing things the wrong way and found a different plumber willing to work with us, so we should be all set to move forward with our plan. Then we started thinking more about the future. We’ve lived in the house for over […]

Ruminating

Doing Things the Wrong Way

We’re doing our project backwards and wrong. We’ve known this from the outset, but plowed ahead anyway. Basically, the right way to gut-remodel a house is to demo everything, rip up the basement floor and put in the new below grade plumbing, get that inspected, pour the floor, do the framing, install rough plumbing and electrical, […]

First Floor Framing

First Floor Framing

It’s Fall now, and we really want to get spray foam insulation installed before winter hits. That means we need all the framing done, as well as rough plumbing and electrical. Fortunately on the first floor we have an open floor plan, so there isn’t all that much framing to do. In addition to a […]

Plans and Permits

Floor Plan Revision

We’ve made a couple of changes to our first floor plan. The first change came about because of stair planning, which moved the landing further back to accommodate required headroom. It also meant the space behind it that was supposed to contain both a pantry cabinet and a coat closet was not big enough. Instead we’ve modified the […]