Tag: re-lining

Back to Waiting

It’s a new year, but we’re still waiting for the basement plumbing. With the city insisting that we needed to repair the sewer tap, the plumbers had to hit us up for more money (a lot more money). The alternative was to run a new sewer line under the house that then tied into the existing sewer line in the front yard instead of re-lining the existing sewer. There are several reasons we decided against that. The first is that we already got a quote for that (from another plumber) and it was still more than doing the re-lining (even with the tap repair). The second is that the tap would still be broken and could fail in the future. The third is that the existing clay sewer line in the front yard goes under the maple tree and will need regular hydro-jetting if it doesn’t gets re-lined with epoxy. Basically, even with the additional cost, this is still a better end product for (probably) less money. Unfortunately, it’s not as much less as it was originally.

We made payment and signed paperwork on the 18th, which was of course the week before Christmas. They came out and resprayed the lines in the street and easement and put up the little marker flags, but so far nothing else has been done. I appreciate the lengths that the plumbers went to to try to save us money by getting the water department to let us skip the tap repair. At the same time, they knew this was likely back in October. If they had just relented then we’d probably be done by now. Instead this project has been going on for over three months when it was originally projected at six weeks. Now there’s snow and ice on the ground, it’s undeniably going to be more difficult, and we’re still living on the second floor and contending with our water heater, freezer, and washer and dryer running on the unheated first floor. Simply put, we’re frustrated, and the huge extra bill right before Christmas didn’t help anything.

We’re resigned at this point to another winter on the second floor, supplementing our undersized radiators with electric heaters and struggling to get the temperature up to 68°. I really hope they are able to continue work if the ground freezes.

Basement Plumbing Update

One of the biggest frustrations with our project for the last several months has been the basement plumbing. First, it took us forever to get quotes from more than one plumber. Then we selected a plumber (not coincidentally one that gave us quotes fairly quickly) and gave them the initial deposit. The original estimate for work was about six weeks, which was over two months ago. Most of the work hasn’t been done yet and the source of delays has largely been the City of Chicago. We pulled our original permits three years ago with a different plumber. Because the permits were already pulled, the existing permit had to be reactivated and the plumber changed. Once that was done, they were able to put in the underground plumbing for the basement bathroom, the floor drain, and the utility sink, including the ejector pit. That was when they told me they were waiting on me to finish the weeping system, which I did.

Sewer work

New basement plumbing

At the same time, they scoped the sewer with a camera and submitted the recording to the City, who came back with a concern about the “tap”, or the connection between our sewer and the sewer main under the street. The plumbers ran another scope, after which the water department decided they wanted the tap repaired. Around this time they said that our other permit for the new water service was approved, but then they turned around and said that the whole project had a “red flag” on it because the original permits weren’t pulled properly. We didn’t get an explanation of what was wrong or how that happened, but the result was that no work could be done at all.

The plumbers reported that they were able to negotiate with the city and get the red flag lifted, and the last update is that we should finally have our permits today. Then the plumbers can finally schedule the tap repair, the new water service, and the sewer re-lining. At this point I’ve gotten a bit skeptical, but this is the most positive sign so far that something is actually going to happen before the ground freezes. The plumbing is the only thing we’re waiting on to pour the new basement floor.