Back Porch Demo

We want to dig out the basement, and the only door is at the back. To be able to get a dumpster into the back yard and haul loads of dirt straight out, we need to tear down the back porch and the garage. We’re planning to replace both anyway, so doing it now makes sense. The back porch is a fully enclosed, two-story, vinyl-siding-clad beast. We took out the stairs from the first floor to the second a while back so we could put in the back sliding door, so it just has steps down to the back door and to the basement.

The first step was to move all of our accumulated stuff off the porch, including the old radiators. Fortunately I found a used radiator company to come and take them and even pay me a bit for the trouble. I disconnected and removed all the old electrical and moved the phone line box from the outside of the porch to the outside of the house.

Windows and doors removed

Windows and doors removed

Saturday morning I started work removing the doors and windows and was soon joined most of by Sarah’s family. We discovered that because the porch was enclosed after it was built, the walls weren’t integral to the structure. The walls consisted of some horizontal 2x4s attached to vertical beadboard, some of which was twenty feet long, and vinyl siding on top of that. While not very strong it held together remarkably well. The big challenge was the right side, where there was no landing or stairs to work from, just a big open space.

Walls coming down

Walls coming down (with Mike and Matt L)

We managed to rip down the right side of the wall in one giant piece. You can see from this photo how the floor only extends to the door in the middle of the house. With that piece down, the rest of the back wall was pretty straightforward.  The right side wall was a bit interesting. We wound up pulling the pieces of beadboard off individually and then the vinyl siding, which at that point was just hanging from itself.

Walls removed

Walls removed (with David and Matt L)

By that point is was evening and we wrapped up for the day. The next day we had a bunch of friends over to start working on the structure. The roof was an open question, since there wasn’t a great way to reach most of it. In hindsight, it may have been better to tear the porch down back when we took out the stairs, since having the landing would have made this process easier, plus we wouldn’t have had to worry about breaking the new sliding door with a piece of falling debris.

Roof removal

Roof removal

We used the ladders and a piece of fencing we bought to fill in the gap to shield the sliding door from the chunks of falling roof. We used a rope on the right column to pull it down after cutting it near the base with a chain saw. At first we tried the pictured system of pulleys to pull it down, but the angle was wrong so we wound up not using them. Unfortunately the porch beams were pocketed into the sheathing, so I have to go back and patch the holes in the outside wall before birds start nesting in the walls. I ordered an extension ladder as well, something that probably would have come in handy for this project, since the folding Werner ladders aren’t quite long enough.

Roof removed

Removing the last section of roof (with Dean, Matt B, and Drew)

We had a bit of a scare pulling down the last section of roof because the left column started to lean out, not only getting close to our power line, but pulling away from the beam that held up the second floor of the porch! After we got the roof section off things went quickly and we got the second floor structure removed. I also screwed the second floor door shut so we won’t have any accidents.

Finishing up

Finishing up (Dean and Matt B)

The first floor went pretty quickly too. We left the section by the stairs so we can still get in and out. We moved all of the drywall out of the garage and the freezer out of the basement and into the first floor, and then Dean and Matt built a new railing while I put up some house wrap over the sheathing and patched the lower two holes in the wall.

All done!

All done! (With Dean, Drew, and Hector)

We now have a massive pile of debris in the back yard (scroll back through the pictures to watch it grow). We’ll need to live with it until we get the garage torn down and a dumpster into the yard, but that should just be a few weeks. I plan to salvage some scrap material to build a ramp that we can use to get wheelbarrows of dirt into the dumpsters when we dig out the basement. This was a big two-day project and we couldn’t have done it without tons of help from family and friends.

A huge thanks go out to the Saturday crew: Mike, Lee, Matt L, Amy, Rob, Nicole, David, Collin, Dylan, and Dustin, as well as the Sunday crew: Dean, Hector, Drew, Anna, and Matt B. Thanks everyone!

Iron Front Door Installation

All right, front door installation time. Because we’re putting two inches of poly-iso foam insulation on the outside of the house, I had to blend a number of installation methods, starting with  the Building Science instructions for both the door and the transom window. We didn’t want to remove the existing porch, and we plan to have a porch in the future, so we used the Green Building Advisor ledger attachment detail to plan around that, and of course we had the instructions from the door manufacturer.

Before any of that could happen, Sarah and I stripped off three layers of siding from around the existing front door. The top layer was vinyl, followed by old cement fiber siding, and finally wood clapboard siding. Interspersed were layers of old paper house wraps.

Next we turned to the new door. When the door was delivered, we tore open enough of the packaging to make sure it was undamaged and then left it until now. Sarah started peeling back the cardboard and foam and asked, “Why does the glass look shattered?”

Broken door glass

Broken door glass

We really don’t know how this happened. The door has been leaning against the wall in the same spot for a month and a half. The glass is actually broken on the other side —that is— the side with the wrought iron. We can only speculate as to what caused it. I contacted the manufacturer and they’re going to have a glass company come and replace it. I’m really impressed by their customer service, since they could easily argue that it happened after I accepted delivery and that it wasn’t their problem. In any case, it wasn’t enough to postpone installation, we’re just really upset about it.

The door crew

The door crew: Dean, Mike (Sarah’s dad), Matt B, and Eriq

Sunday morning the door crew arrived, comprised of regulars to our house project. Dean and I got the old door out of the way and cut out two additional studs. We propped up the wall with some temporary boards while we framed in the header, just in case the house got a case of the saggies.

Trimming the sheathing

Trimming the sheathing

I’ve gotten pretty handy with a reciprocating saw. Once we framed in a sill plate, jack posts, a 2×4 between the door and transom, and a proper header (spaced with insulation), we nailed 2x4s flat on the outside around the opening. We wrapped the edges with housewrap and then attached ½” foam on top of the 2x4s. That way the two inches of foam on the rest of the house will be the same thickness as the edge around the door. We used WeatherMate flashing tape and sill pans to flash around the edges and make everything water tight.

Then we slid the door frame into position and tipped it into place. We put in one bolt in the top corner and then pivoted it a tiny fraction of an inch to get it perfectly level before putting in the remaining lag bolts to secure it to the inside of the framing. The transom was attached from the outside with facing clips that were screwed through the foam and into the framing, just like the other windows. With some exertions from Eriq and a lot of yelling we got the door hinges aligned and the door onto the frame.

Iron door installed

Iron door installed

We realized that my existing handleset with an interior lever wouldn’t work because the lever didn’t clear the frame of the window in the door, so I picked up a replacement with a knob. The matching rubbed bronze looks better with the door than satin nickel anyway. I also put in backer rod around the edges and filled the gaps with Great Stuff foam and Sarah finished the interior with another layer of backer rod.

For the time being it looks kind of silly on our otherwise crappy-looking house, but eventually when the rest of the house catches up to the door, it’ll be amazing. As always, I have to finish my post with Sarah and my heartfelt thanks to everyone that helped: Dean, Mike, Matt B and Eriq. Thanks, guys!