Bay Leveling

Removing floor boards

Removing floor boards

The pre-subfloor leveling isn’t quite done yet, and the bay window on the front of the house brought its own set of challenges. For starters, the joist running across the very front of the house (and across the widest part of the bay) is embedded in brick, meaning I couldn’t jack it up the way I did most of the others. There’s also a gap of nearly two feet between that joist and the joist in the center of the bay, which is considerably wider than the 16″ that most of the joists are spaced. Finally, the old floorboards rested directly on top of the brick foundation and extended under the bay walls, whereas in most of the balloon-framed house, it only reaches the edge of the wall.

Level? ish?

Level? ish?

When we rebuilt the bay windows, I noticed the floorboard situation and debated replacing it then, but between doing only one window at a time and the corner studs not being replaced, I decided against it. That meant the first step was to use an oscillating multi tool to cut the floorboards back at the wall edge. Then I glued shims to the top of the existing joists and added some blocking joists to better support the gap between joists.

Shimmed, Reinforced, Re-mortared

Shimmed, Reinforced, Re-mortared

Questions sprang to mind of how to control air and vapor infiltration through the foundation and through the gaps in the wood, and how to insulate the bay properly. We’ll be spray-foaming the cavities in the wall, and on the sides of the house we’ll spray foam the top of the foundation wall to air seal it to the wood, but here that isn’t an option because the brick comes all the way up to the underside of the floor. The exterior rigid insulation doesn’t help either because it doesn’t extend over the brick.

Front shim and spray foam

Front shim and spray foam

I decided to attach an inch-thick shim to the inside edge of the brick wall (on top of sill gasket) that will support the subfloor. In front of the shim, and along the top of the brick on the sides of the bay, we’ll fill with spray foam. I’ll also glue the outside edges of the subfloor to the framing to further seal everything. Hopefully that will be sufficient, since it will be damn difficult to do anything about it with the subfloor in place.

When I initially test fit the shim I realized that the brick was —perhaps unsurprisingly— uneven. In order to properly support the shim I had to mix up some mortar and straighten out the top of the foundation. That meant waiting a couple of days for the mortar to set up, but then I was able to drill some holes into the brick and secure the shim with Tapcon screws.

First piece of OSB

First piece of OSB

I went through a few cans of “big gap” Great Stuff, since the real spray foam won’t be for a bit. Fortunately it’s so cold that it cures slowly, giving me ample time to even it out. I got the first of three pieces of OSB down that go into the bay. I took my time and worked out the dimensions exactly, accounting for all of the unevenness of the studs. There’s still a small gap along the edge of the angle, but I’ll fill that with caulk. The important part is it’s secure, level, and insulated. I’m considering whether I should exchange the one piece of blocking in the center with two, since that would be a more proper 16″ spacing, plus there’s a good chance I’ll wind up putting an electrical outlet in the floor there. One of the reasons to use screws instead of nails is you can change your mind without too much hassle.

Subfloor Frustrations

Leveling joists

Leveling joists

I spent nearly all of this past weekend leveling the joists in the first floor. That effort was largely successful, with the nine remaining 12′ spans all adjusted to within a sixteenth of an inch using Method 3. I also leveled five other joists that required the tapered shimming method and got a few more sheets glued and screwed down. My hope, and in fact my expectation was that having done that I would then be able to start putting down full, 8′ sheets of OSB, allowing me to finally finish up this project.

Using the shimming method

Using the shimming method

Unfortunately, that hasn’t happened. In addition to not being level, the joists are not evenly spaced. They employ a generous “sixteen” inches on center alignment that means the 8′ sheets don’t line up in the middle of a joist at either end, sometimes coming short of one joist entirely. I tried planning ahead, measuring out to the next sheet and seeing if I could make one sheet stretch, but it just didn’t work. Instead I’m finding myself cutting sheets at roughly 32″, 48″, or 64″, plus or minus an inch or so.

Slow progress

Slow progress

On top of this, I’m finding that the walls aren’t exactly even either, so that I’m having difficulty getting the panels to align evenly down a joist and one panel to the next. After putting down an 8′ panel that left a gap at one corner and was snug at the other, I decided I needed to do better. As a result, instead of cutting my panels square at say 48″, I cut an edge that tapers back a ½” or so from the tongue to the groove, so that panels meet in the center of the joist and the tongues fits snugly into the grooves. This is precise and thus time consuming work. Tonight I spent two hours putting two small panels down, incrementally increasing the completed area by a whopping thirty-six square feet.

Cutting tapered ends

Cutting tapered ends

When I finished carefully scribing, cutting, and fitting the second of these panels I discovered that the joist was torqued and the shim I glued down was sticking up on the exposed side. Because of this, the second panel is raised up higher than the first. It’s a slight difference, but after the inordinate amount of time I’m spending to make everything level, it’s extremely frustrating. I’ll probably have to go back around with the power planer and even at least a few seams.

Argh! Not even!

Argh! Not even!

I keep reminding myself how I wanted to hire this project out, and thinking I really should have done that, high cost or no. At this point it’s starting to feel like it would have been worth it, assuming they would have done as good a job. It’s hard to even estimate at this point how long it will take me to finish. I’d like to think I’ve figured out my methods now and it should go faster, but who knows. The bay will bring its own set of challenges and I still have some of the shorter joist spans to level. After that I need to fill in the narrow, 5″ gap all along the North wall. Needless to say, I’m really looking forward to this project being done.

On the Level

Before we bought our extreme fixer upper, we watched a lot of Holmes on Homes. In addition to an irrational fear of hiring contractors, the show also instilled the importance of building level, plumb, and true. When you’re renovating an old house that’s something of an uphill battle, and at times it’s downright impossible. However, we’re planning on in-floor radiant heat, which uses plywood and aluminum panels that lie on top of the subfloor and has channels for PEX tubing. The subfloor needed to be level and flat, and the existing plank floor was not going to cut it.

Wet wall subfloor

Wet wall subfloor

The first new subfloor was done when I reframed the wet wall back in September. At the time I decided that “level” was where the joists rested on the steel beam at the center of the house, since I knew the beam was level. The joists sloped slightly higher toward the South wall, so I used a planer to shave them down to be level and put the new subfloor down. I call this planing method of leveling “Method One”.

Shimming over subfloor

Shimming over subfloor

When I started work on the back section of subfloor, I realized that the wet wall was the exception rather than the rule when it came to joist height at the South wall. Most joists were ¾” higher at the outside wall than the beam, making Method One a bad option. Not only would planing that much off be a time consuming pain, I didn’t like removing that much wood from the joists. I decided instead to establish a new level, on top of the small section of subfloor I’d already done. Instead of planing down, I cut and glued down long shims that tapered from nothing to ¾” (depending on the particular joist) over the course of ten feet. This is “Method Two”. It is also a pain in the ass, but slightly less so. There were a few variations of this while we tried to work out the best way to do it.

Jacking up joists

Jacking up joists

With the back section leveled, but time consumingly so, I wanted to find a faster way to do it. Since the ¾” slope was fairly consistent, I next tried jacking up each joist at the beam and/or the outside wall and putting a shim underneath it, using my trusty hydraulic jack. This is “Method Three” and so far the most straightforward, if still time consuming. In some cases this was all I needed to do, while in others there was still a bow in the center of the spans that I fixed with a long shim, ala Method Two.

I did consider some other methods, such as sistering another joist to the first one. Some people have even used just a 2×4 rather than a full height piece. I didn’t do that partly because I didn’t want to rip out and replace all of the cross bracing between the joists, plus I don’t like the idea of the weight being carried off center of the joist. I want the floor to be as quiet as possible, which is why all the shims and subfloor are being glued down in addition to screws.

Shimming under the joist

Shimming under the joist

I still have a ways to go before the subfloor is done. I’m doing the leveling and the subfloor installation concurrently because we need a way to walk through the first floor, plus a place to put all of our tools. I’ll be working on it in the evening this week as well as this coming weekend. I’m hopeful I can finish by Sunday, but we’ll see.