First Floor Stair Opening

My friend Dean came back last Saturday to help me work on the house. We spent some time sorting through my scrap metal pile, getting all the copper, brass, and aluminum separated and pondering what to do with the remaining near-worthless steel and iron. Then we started work on framing the opening for the first floor stairs.

Stair opening

Planned stair opening (not actually green)

The new stairs will be several feet further back in the house to increase the front bedroom size (currently 8′ x 7½’). This means the existing opening between the first and second floor needs to move. In addition, because we’re adding steps to the attic, the opening will change shape, from an L to a rectangle. One advantage of this design is we can put a solar tube in the roof above the stairs and a light well will allow natural light all the way down to the first floor.

Dean putting up the wall

Dean putting up the wall

After adding some blocking from below between the first floor joists to bear the wall, we put down a sill plate board and used the laser level to position a sistered double joist directly above it. Getting the joists into position proved the most difficult part of the process. We were able to frame the wall on the floor and tip it into place. The laser level proved accurate: once it was aligned on the sill and joist, the wall was perfectly plumb.

Sistered joist on opposite side

First sistered joist on opposite side

Sunday I positioned the sistered double joist on the other side of the stair opening. This set the boundaries of what need to be removed and what needs to be filled in. Last year when we demoed the old stairs, we also demoed the middle bedroom we were using as an office so that we could make way for the new stairs. Last December we filled the room back up with debris from the attic, so Monday evening I cleared it all out, dropping the boards straight down into the basement and then piling them for later use. Tuesday evening I pulled up the hardwood floor (which was good enough to come up in sections still attached to the furring) and the subfloor.

Dean sistering joists

Dean sistering joists

Sunday morning Dean returned, bringing his old but compact jigsaw which fit between the floor joists. This allowed me to cut out the joists over the new stairwell and give them to Dean, who put them back up over the old stairwell, sistered to the existing partial joists. Then I put in a new joist down the length of the opening directly above and flush with the beam.

Opening finished

Opening finished

Once again, we’re very grateful to Dean for his assistance! This felt like a big step forward toward getting the stairs in and the first floor framed out. It’s pretty amazing how big the space is. On one hand it feels like a bit of a waste, since we’re losing almost a hundred square feet out of the second floor, but in exchange we’ll get two bedrooms in the attic, so I think it’s a worthwhile trade.

Stair Planning Redux

Almost exactly a year ago I spent some time working out where the stairs would go and how exactly they would be configured. This was because the original design work I did had overlooked some issues that the architect caught, but in so doing he caused a lot of other problems. For example, in the approved drawings we have there’s only 5′ 10″ of headroom on the first floor landing. So I recalculated everything last year and had worked out a plan that was pretty good. I used that plan to position and size the basement stair opening.

However, since then I have leveled the first floor subfloor, which means the height from the first floor to the second is slightly different than it was when I made my calculations. Not only that, but if I plan to level the second floor as well I need to consider its height when it’s done rather than its height now.

Stair Planning

Stair planning with minimum required headroom

Another factor is that I read up on load and span limits for the stair stringers. Since the opening for the basement stairs prevents me from having any intermediate support for the first floor stairs, they need to be able to span the whole distance to the first landing, which is nearly ten feet. That means I need to use 1 ¾” x 14″ thick, 1.55E stringers, which are bigger than I planned. That affects the headroom in the landing going down to the basement. Finally, the rise for each step must be equal and no more than 7¾”. The current rise floor-to-floor  averages about 10’11” (131″). I can’t fit more than 17 steps, so the closest rise match is 7 ¾” for a total rise of 131 ¾”. I guess I’ll just level the second floor to that height.

So, I went back to my model in Sketchup and started re-working the plans. I got a bit frustrated because I was spending a lot of time drawing things out just to figure out it wouldn’t work. I finally realized I need to draw the required headroom and clearance, so I could see how much space I needed.

Second floor stairs

Second floor stairs

Once I did that, it started to come together. It’s a tight fit between the multiple stories, roof slope, and other available space restrictions. There are a couple of things that are less than ideal. In the picture above you can see that the second floor landing will need to be notched so there’s enough headroom coming up from the first floor, but structurally it will be fine. There’s also the roof pitch clipping a triangle of headroom above that landing, and the stringers which are notched onto the edge of the landings rather than completely on top to provide enough space to meet code.

The good news is that I can figure this out on the computer and that it will all meet code requirements and I should be able to get a queen-size mattress up the stairs (and not bonk my head on the underside of the landing). Now I can get my LSL stringers on order and start framing the first floor landing.

Back Yard Cleanup

Our back yard has been collecting material from the house. First we excavated the new footings in the basement, which resulted in a large mound of clay. Then, between the chimney removal and removing the brick fire blocking during subfloor install we added a giant pile of bricks and mortar. We removed the mortar from all of the good bricks and stacked them in a neat cube, but the broken and crumbling bits we just piled next to it.

Clay, bricks, mortar (and Derek)

Clay, bricks, mortar (and Derek)

In addition, we had an old raised garden along one side of the yard. It wasn’t the lovely cinder blocks that made us want to get rid of it now so much as the dirt itself: full of shredded plastic bags from rats nests, broken glass, bottle caps, an oil filter, bullet slugs, you-name-it. Sarah wouldn’t plant vegetables in it, so we used separate planters. She was planning to put a shovel-full of dirt into our garbage toters every week, but that was going to take forever. Instead we decided to get another dumpster (#4 if you’re counting).

Our beautiful garden

Our beautiful garden (and Derek)

An added incentive to take out the garden sooner rather than later was that the wooden fence was bent into the neighbors yard because the dirt was piled directly against it. The small suspended fence you see above was screwed to the posts of the larger fence behind it.

Piles cleanup up

Piles cleanup up

In addition to cleaning out all the clay, mortar, and broken bricks I shrink-wrapped the stack of bricks to make it a bit safer for Derek to be around. I don’t want anything to fall on him if he tries to climb on it. We were supposed to get a 10 yard dumpster for heavy debris, which is fairly short. I was hoping to make a simple ramp so that I could dump wheelbarrow-fulls into it. Instead they brought a 15 yard dumpster and said not to fill it up all the way. That meant it was too tall for a ramp and I had to instead carry three or four buckets in the wheelbarrow and then empty them over the side one by one.

Garden removed and fence fixed

Garden removed and fence fixed

The dumpster was delivered midday Thursday. By midday Friday I was exhausted, so Sarah came down and filled the buckets while I carried them out. The work went faster and it was a lot easier than doing all of it (not counting Derek’s assistance). We finished up Saturday morning, though the dumpster was blocked by a car and they wound up not picking it up until Monday. I’m interested to find out how many tons it wound up being.

Dumpster nearing the "two-thirds full" line

Dumpster approaching the “two-thirds” limit

We’re excited to have our back yard opened up a bit. With all the crap we’re doing to the house, the back yard —ugly as it is— is one of our favorite places. We didn’t have much of an outdoor space of our own at our condo. Having room for a table and chairs, a fire pit, a sandbox, and room for some small garden beds and compost bins still feels like a treat. Our other impending cleanup activity is the scrap metal pile in the basement. That won’t entail a dumpster, but like this will be a lot of work. Our house has more tons of material to disgorge before everything’s said and done.