We’ve been hard at work in the basement. Since getting the new electrical installed and putting in the LED bulbs, we’ve pulled up all of the linoleum tile to make way for concrete floor removal. I bought an electric concrete saw from Amazon, but it uses a 20-amp plug. As it happens, we now have two 20-amp outlets, thanks to the new electrical, but we don’t have a 20-amp extension cord. Home Depot didn’t even carry one, aside from a 9-foot “appliance cord” that wasn’t going to reach very far in the basement. I ordered the extension cord from Amazon as well, but I didn’t want to sit idle over the weekend. That meant it was time to break out the sledge hammer and do things the old fashioned way.
Using a combination of sledge, pry bar, and my rotary hammer in chisel mode, Sarah and I managed to break up all the concrete on the North side of the basement. We spent a fair number of hours on it Saturday, Sunday, and last night. The other half of the basement (technically sixty percent) we’ll use the saw, since it’s covered in ceramic tile and we don’t want to crack the sewer pipes running somewhere underneath it by swinging the sledgehammer too much. My hands are pretty sore from the sledging we did so far, so switching to the saw sounds like a big improvement. The problem with the saw is dust. For that I’m hoping the shop vac attachment will make a difference, since we can’t use water with the electric saw.
Sarah ordered a dumpster for Thursday, and we’ll have it for two weeks. We need to have the whole thing broken up and hauled out by then, aside from the back corner where the water heater and laundry are. Those can wait a little while longer.
February 25, 2015 at 6:23 pm
That looks like a ton of work (several tons probably). Very impressive.