Month: July 2024

Garage Excavation Prep

After a number of quotes, we bit the bullet and signed on to get the garage built. We made an initial deposit on Friday and they said they’d be in touch Monday to discuss scheduling. Instead, Monday they showed up with an excavator. Unfortunately, even though the concrete demo was done, we weren’t quite ready for them to start.

Monday morning surprise excavator!

Primarily, we needed to get the fences along the sides of the yard removed. We also needed temporary fencing, a porta-john, and while they had asked if we had a survey and we said yes, we actually needed the physical survey markers at the corners of the property. So they wound up leaving and left us to get prepared. Sadly, we also had to take down the swing set I built for the kids during Covid.

Fence panels removed on North side

We started with conversations with the neighbors to either side, getting permission to encroach temporarily on their yards during construction. On the one side, the fence was built during their renovation, but on our side of the property line. That made it our fence, so we just needed to make sure they were ok with closing off their access to the sidewalk along the garage while we removed it. They have a toddler and we want to make sure their yard is secure.

Fence posts removed, temporary fence delivered

On the other side, there’s actually two fences, a chain link on our side and a wooden picket fence on the other. We got permission to relocate the wooden fence about a foot back from the property line as long as it was secure for their dog. We got the porta-john, the temporary fencing was delivered, we got an expedited survey done, and took out the fence.

Chain link fence and stump removed, South fence moved

The fence posts and the tree that had grown in between the two fences were the bigger challenge. We picked up a “farm jack” which was a tool I was previously unfamiliar with but will use anytime we have a post to remove in the future. It lets you ratchet the post straight out of the ground, with or without the concrete footer attached. Sarah and I took out about eight or ten wood and metal fence posts in fairly short order. I wasn’t as lucky with the tree stump. That required some extensive work with a reciprocating saw and long blade, but I managed to get that ripped out of the ground. Sarah and I moved a few sections of the wooden fence on the South side back a foot and made it secure for the dog next door.

With everything removed and prepped and all of the fence debris and landscaping stones cleared away, we let the contractors know they were good to proceed. They showed up the following week on Tuesday and had the footings completely excavated in just a couple of days. They actually cut back the sidewalk on the neighbors side where it was over the property line, so we’ll need to fix their side gate once the walls are up.

Back Yard Concrete Demo

I’m going to skip over all the things that I haven’t kept the blog updated about and go straight into covering various projects. So, I apologize that they won’t be posted in chronological order, since we’ve done a ton of projects since I fell off the posting timeline and the effort involved in getting caught up on everything is a big reason I haven’t bothered.

So, concrete demo. Let’s back up a step. When we bought the house, there was a two car garage in the back (we have an alley). It was probably a 1.5 car garage when it was built but they poured a three foot concrete pad next to the garage and literally moved the wall over, increasing the door size in the process and adding a single car door to the yard (maybe the original door? I don’t know) and extending the roof to reach the wall in its new location. So the garage was in bad shape, none of it was done well, and we tore it down years ago. In addition, the back yard had a concrete patio covering most of the area in back.

In addition to wanting a new garage, we wanted to get rid of the concrete patio. We plan to eventually put in a smaller paver patio. When we started getting quotes on the garage, we asked for removal of the patio concrete at the same time. When we took out the loan to finish the house, we wound up removing the garage because the overall price tag was just too much.

In hindsight, it may have been better to just do it, since the prices have not come down in the subsequent years. The garage quotes were really high and we started looking for any way to bring the price down. One of the ways to do that was demo the concrete ourselves.

So, we got a hand-me-down barely-used electric jackhammer from Sarah’s dad and set to work. As with most of these projects, it was harder and took longer than expected, but three heavy-debris dumpsters later, we’d completely cleared the back yard of concrete. The hardest bits were reinforced with steel mesh, and 4-8 inches thick throughout, with most of the patio being 6 inches thick.

The kids helped too, using the jackhammer (with supervision), hauling concrete chunks, and raking and shoveling the tinier bits. The neighbors did not really appreciate us using the loud jackhammer on and off for a couple months. We tried to limit how long we went and which days to be less annoying, but I’m sure we tried their patience. When we got to the back of the yard, we needed to remove and re-build the fence which was a project in and of itself.

In the end, all this was probably not worth it. If I’d known the patio was six inches thick with re-mesh, I may have just paid to have it done since while it absolutely saved us a couple-few thousands of dollars, it wasn’t so much that it felt truly worth the time and effort.

With the concrete removed, we still have a few steps before we’re ready to build a garage, but I’ll cover that in the next post.