Basement Bathroom Ceiling

We’ve been so busy that I’m falling behind on blogging! With the inspection behind us, the next order of business was to install the bathroom exhaust fan ventilation. I had done some reading and decided that the best way to do this was to use PVC pipe, as opposed to the galvanized metal ducting that is typically used. The ducting can leak if there’s a lot of moisture condensing unless the mastic and taping are perfect. Even if they are, if it isn’t perfectly wrapped in insulation water can condense on the outside of the duct. On top of that, all the moisture can mean that even the galvanized metal will start to corrode and rust over time. PVC pipe, however, is impervious to these problems. You slope the pipe to the outside, so that any condensing moisture drains out. Since this is in the basement ceiling, it’s a straight shot between two joists to the outside wall, at least until it gets to the rim joist.

In most houses, a rim joist is 2x dimensional lumber, the same size as the joists, running around the outside perimeter. Cutting a 4½” hole is just a matter of a hole saw. However we have a balloon-framed house where the rim “joist” is more of a rim “beam”: a 6″ high, 8″ thick wooden sill that sits on top of the brick foundation. The floor joists are notched into it and the wall studs sit on top of it. Getting through this was going to take more than a hole saw that would bottom out in less than 2″, and specialty bits were very expensive.

Instead I pulled out my cheap, trusty Harbor Freight reciprocating saw. Instead of a nice round hole, I cut out a 4½”-wide block, then cut a round hole through the sheathing and siding. It took a long time, and I actually took a few breaks to keep the saw from overheating. It would have gone faster but I only had one dull blade that was long enough. The rest was easy: I cut the pipe to length, used silicone caulk to seal it to the bathroom fan, and put a cap on the outside. We need to use some canned foam to seal around the hole in the wall.

Next up was leveling the ceiling. The floor joists were of various heights, partially because they’re old and partially because in this section I was still working out the best way to level the floor above. I screwed 2x4s to the sides of the joists at the lowest level. I wound u having to add blocking along the top of one wall, because the ceiling was now lower than the top plate. I ran into some further challenges on the other side, having to cut down 2x4s on the table saw so they’d fit in some confined spaces and adding some ½” plywood in another spot, but at the end I could put a level to it that didn’t wiggle, so I knew drywall would work.

After that was done I was on to insulation. We’re insulating between floors for a few reasons: sound proofing, fire resistance, and to keep the in-floor radiant heating in the floor above instead of in between the floors. I picked up a bunch of Roxul Safe’n Sound insulation and installed it in the area above the bathroom. For the time being we’re not installing it in the rest of the basement ceiling because we will still need to run plumbing and electrical up to the other floors, but the bathroom ceiling is getting drywalled, so this is the only opportunity. With that done, Sarah and I put up moisture-resistant fire-code drywall.

Once the shower surround is in and the rest of the drywall is done we’ll start mudding and taping. We got some more water in the basement, so we also have some additional downspout modifications to perform along the side of the house. It feels good to be back at it and getting things done!

Basement Rough-in

It’s been a long time coming (like most things in this project) but we’ve passed our rough plumbing inspection for the basement! We passed our electrical inspection a month and a half ago, but we’ve grown used to the plumbing going slowly. This phase of the project was frustrating because we couldn’t do much ourselves to speed the process along, and we kept running into issues. Fortunately, all of them have been resolved.

Bathroom rough-in

Bathroom rough-in

Our new water service is a 1½” copper line, whereas our old service was only ¾”. Because of that, when we installed our whole-house water filter a few years back, we ran ¾” pipe. The plumbers took out a lot of that line when they brought in the new service and started adding branches for the bathroom, including the connections for the water heater ( temporarily on the first floor) running mostly in 1″ before and after the filter. On top of that, when I went to hook the filter back up, I realized that the new curb in the basement was preventing the filter from sitting close enough to the wall to connect to the existing pipes, meaning I was going to have to reconfigure it anyway. I bought new, bigger, 1″ filter housings and asked the plumbers to re-plumb the remaining section so that everything would be 1″ (and to add back the water heater hookup while they were at it).

Filter re-installed

Filter re-installed

The plumbers seemed vexed by the filter setup and I had to have them come back and change it multiple times until it was correct. This added weeks to the process all by itself, on top of the generally slow work they’d been doing. Then they asked for their money, so I asked when it was going to get inspected. That took another couple of weeks to get the inspector out, but they finally wrapped up Thursday of last week.

The electrical work went quickly because a lot of it was already done last year, but there were a couple of additions and modifications. We had to redo the grounding strap because the water service moved to the front of the house, add outlets for the sump pump and ejector pit, and add the switches, lights, and outlets for the bathroom and other new interior walls. We still need Lester, our radiant contractor, to come back and connect the PEX lines in the slab and disconnect our radiators on the second floor, but that shouldn’t impact the rest of the work we’re doing.

We were gone all weekend, but now I’m finally back to work, with a new goal of getting us moved into the basement by August 20th, the fifth anniversary of us moving into the second floor. I think if we’re still living in the second floor more than five years into our “five-year project”, I’ll have to start considering arson. There’s a lot to do, starting with the venting for the bath fan, leveling the bathroom ceiling, and a few other minor tasks. That will be followed by drywall and tiling, the temporary walls, and the bathroom fixtures.

Unexpected Water Management

In my post about the sump pump, I discussed our concerns about water in the basement. Those concerns have proved well founded, because after some heavy Spring rains, it happened. Our interior weeping system directs water under the concrete slab to the sump pit and the sump pump pumps it away, and this system is working great. However, water doesn’t always come from below. Because of the thick, clay soil, water following the path of least resistance can come right through the brick basement walls. That water is coming in above the footer curb in the basement and then drains onto the top of the basement floor, bypassing the weeping system completely.

There are ways we could have avoided this. The preferred method is to excavate around the outside of the house and install a water barrier on the outside of the basement walls, but our house is less than four feet from the neighboring houses to either side, risking structural collapse of both our basement and theirs. Another method is installing a dimpled plastic membrane on the inside of the basement walls that provides a path for water to drain down below the slab and into the interior weeping system. We didn’t do that for a couple reasons. First is the potential for damaging the bricks, both from persistent water and from freezing. Second is that the membrane would have to wrap over the footer curb, and we’d have to frame walls in front of it, further reducing our floor space (by about 50 square feet). While we do plan to insulate inside the brick walls, we’re going to do so without a vapor barrier, so that the bricks can dry if they get wet. The interior-facing side of the footer curb will remain exposed, or at most covered by trim.

Old downspout accordion

Old downspout accordion

While we’re exploring ways to divert water that comes through the walls, the bigger focus is on keeping water away from the basement walls in the first place. Recently it poured, and I discovered that the downspout I’d put in after we removed the back porch was clogged, causing a fountain at the back corner of the house right where we were getting most of the water. Once I fixed that, the downspout was splashing about fifteen feet into the back yard… and then running across the patio to the other corner of the house. Worse still, our neighbors’ downspout was clogged and all the water from half their house was cascading into the gangway. The downspout we had on that side was running across the gangway and wasn’t sloped away from the house, so water was draining to the same corner. I got the water from both our gutters to divert to the stone-filled catch basin, but something more permanent was needed.

I ran to Home Depot and got some supplies, then got up on a ladder and reconfigured our downspouts. The gutter on the gangway side now drains across the back of the house between the first and second story, where it joins with the other downspout. It then drains about twenty feet from the house, but I plan to extend that to thirty. I also unclogged the neighbors gutter and ended the waterfall in the gangway. Since making this change we haven’t seen additional water, but I’m not yet convinced we’ve solved the problem. I have some other steps I can take if we see any more water.

Basement Back Door Trim and Light

Caulked back door

Caulked back door

I installed the basement back door in March. Once the floor was set up and the walls were framed Percy, our electrician, came out to finish the basement electrical. One of the items on the list was the back door light. In order to get the electrical run properly we decided to finish the trim on the back door. I started by caulking all of the seams around the framing to ensure a good air seal.

Back door trim

Back door trim in progress

I bought PVC trim, because I don’t want to have to do extra maintenance once the house is done. I debated scribing the edge against the brick, but ultimately I discovered I could use the angle grinder with the masonry disk to remove both excess brick and excess PVC. The door is recessed in the wall because the floor slab doesn’t come up to the front edge of the wall. Because of this, our rim joist (which is 6″ x 8″) was exposed, so I needed to trim that as well. The initial electrical was just a piece of conduit, but we wound up with a standard mud ring on a 4″ box. I used the sunken PVC screws with caps, but the color didn’t quite match. We’ll be painting over this anyway to prevent UV fading.

Trim installed

Trim installed

The biggest challenge was the light fixture. The first one we bought didn’t fit because the back box didn’t fit inside the recessed area of the trim. The second light I ordered wasn’t the same size as the specifications, so it hung down too far (the door swings out). We’ll save that one for the first floor. Finally, after a lot of searching for something that didn’t stick up, didn’t stick down, and had a small enough base plate, the third light I ordered fit (if just barely). It’s a barn style light that I put an outdoor-rated LED bulb into.

Light installed

Light installed

We’re pretty happy with the end result. Having an actual outdoor light that works on a light switch is a bit of a novelty for us. The last outdoor light we had was a flood on the back porch (on the second floor) that we didn’t use much. The three different shades of white are a bit irritating, but we’ll get to that eventually.

It works!

It works!

You can see a sneak peak of some of the plumbing and electrical work that’s been going on. In this photo I’d caulked the left side but not the right (it started raining). I’ve since finished it up, but we still haven’t painted. That will probably wait until I’ve trimmed the rest of the basement windows, and possibly until we’re siding the rest of the house.

Sump Pump

I installed the interior weeping system back in late October after the plumbers said it needed to be finished for them to continue (Ha!). That’s also when I put in the sump pit (aka crock, aka basin) and I researched and ordered the actual sump pump, but it didn’t get hooked up until yesterday when the plumbers connected the drain line. I used a ton of zip ties to get all the cables neat and tidy.

One of our big concerns has been water in the basement. The biggest reason is we’re planning to move into the basement for the next year or two and water would be a pretty big problem, but even if that weren’t the case the basement will be part of our finished space and flooding could be a huge expense. We know multiple people with similar houses that have experienced basement flooding for several reasons, so we’re taking the steps we can to prevent that from happening to us.

Unfortunately, the biggest factor in basement flooding is something we haven’t tackled yet, namely gutters that direct rain water away from the house. Because our second floor has a bump out that we’re planning to remove, we haven’t redone our roof and gutters yet. Because we’re a long way from landscaping, we haven’t taken up the sidewalk along the side of the house and put in a drainage system and a rain garden. Because we haven’t put in new windows on the second floor, we haven’t re-sided the house to prevent water from getting into the brick foundation walls. So, there’s a lot to do. In the mean time we’ll be relying on the sump pump to keep the water out of the basement. The good news is that despite a fairly rainy Spring and the sump pump not being connected until yesterday, the floor has been dry. The bad news is we’ve had a dehumidifier running non-stop for weeks and the basement still has 90% relative humidity.

StormPro System

I read a lot about sump pumps and I weighed a lot of pros and cons, reviews, opinions, brands, and specs, and I settled on an Ion Genesis StormPro sump pump system, all pre-plumbed so it just dropped in. This system uses a smart controller, two separate ⅓ HP pumps, and two separate digital water level sensors to keep everything working smoothly. The controller alternates between the pumps to prevent one from sitting idle for too long, or uses both if one can’t keep up.  The water levels sensors are extremely accurate and reliable, with no moving parts and complete redundancy. There’s a high level alarm and we can connect the controller to our alarm system to notify us remotely if there’s a problem. The only important feature it doesn’t have is battery backup. The reason for that omission is we’re planning to install solar panels on the roof along with a Tesla Powerwall battery backup for the whole house. The sump pump will (eventually) rely on this as well. Our power has been pretty reliable, so we’re not worried about not having the backup in the short term. Of course, since I ordered, the “Genesis” controller has been upgraded to the “Endeavor” controller (pictured above) for the same price, which adds some additional functionality.

Sump Pump Installed

Sump pump controller installed on boiler panel

For the time being, the sump is draining into the sewer and out to the City. Chicago allows this (for some reason) so we’re taking advantage of it, since we don’t have the aforementioned rain garden and drainage system outside. We intend to divert the sump pump to that once it’s in place, both because it’s the right thing to do (it doesn’t make sense to mix storm water with sewage), and because we’ve heard of backups in the sewer system (because of all the storm water) that mean there’s no where for the water to go.

Control Panel

Control Panel

When I turned on the sump pump, the pit was pretty full. The alarm sounded and the display told me there was high water. After testing both pumps, it quickly drained the basin and it’s been running only occasionally since then. The display shows the amperage draw of the pump (helpful if there’s blockage or other motor problem) as well as the water level in the basin down to a fraction of an inch. The controller lets you set the water fill level in half inch increments. We have a large 30″ basin, so I set it for 8″. The plumber informed me that the city inspectors have been requiring the sump pit to be proud of the floor by a couple of inches, something I didn’t know when I installed it level with the top of the slab. Hopefully they don’t have a problem with it. Given where the holes in the sides of the basin were and the slope that I had to put on the drain pipes, I couldn’t have put it any higher than I did anyway.