Basement Dig Out – Part 2

Ramp to basement

Ramp to basement

I’ve got this great new workout you should try; it’s called “pushing wheelbarrows full of clay up a steep ramp”. In the last two weeks we’ve filled two 10-yard heavy debris dumpsters, emphasis on the heavy. Tomorrow they swap the full dumpster for an empty one and it starts again, so this is basically our day off. We’re getting one per week and I expect that to continue for the next couple weeks.

Second dumpster filled

Second dumpster filled

Our original wheel barrow was old when we got it and was not up to the rigors of this project.  The bucket tore loose from the frame and we set it aside. Sarah’s dad lent us his wheelbarrow, but it’s looking a little crooked these days. Sarah bought two new wheelbarrows, and between the three we’ve been putting them to use. I hauled 30 loads in two hours Saturday evening. I’d guess each dumpster is about 150 loads, since we can only fill the wheelbarrows about half-full and still push them up the basement ramp. The ramps are working well, though the one up from the basement is the tough one, especially when it gets slick from the rain and mud. The ramp I built to get up to the top of the dumpsters is great, though. That was time well spent.

Digger and wheelbarrows

Digger and wheelbarrows

The digger (mini excavator) has proven its worth too. Every time we grab a shovel to manually dig around the footings we’re given a taste of what the task would have been like without it, and it’s just awful. Digging with the backhoe on the other hand is a breeze. Hauling up bucketfuls of heavy clay, the hardest part is dropping clods into the wheelbarrows without knocking them over (especially the crooked one) and not digging too deep. I used my laser level to confirm the footings are pretty consistent in height, so we just need to dig even with the bottom of them, about 14 inches total.

Excavation

Excavation

Looking forward, we’ve gotten about a third of the dirt removed. With the dumpster we get tomorrow we can get most of the next third removed. That means it will be time to move the water heater and the laundry upstairs so we can pull up the last section of concrete floor. I’m taking off some time from work next week to get that done as well as level what we’ve dug so far. Our goal is to finish with the digger by the weekend after Memorial Day, which includes digging out the new back steps. May’s looking pretty busy!

Basement Dig Out – Part 1

Loading dumpster

Loading dumpster

It’s time to start digging out the basement! We got the first heavy debris dumpster in and last week I took out the concrete back steps leading out of the basement with a sledge and the rotary hammer so we can make a ramp. I used the concrete saw to cut out a section of patio at the top of the stairs to make the ramp more gradual, then put in a section of shingled plywood from the garage roof so we could start bringing wheel barrows up.

We got the leftover concrete that didn’t fit in the previous dumpster loaded, along with the pile of bricks and dirt that I’d pulled up by hand. Just that was enough to fill the dumpster to the point that we had to close the door. Then we started using the ramp and platform I built to dump full wheelbarrows into the dumpster.

Mini excavator

Mini excavator

Saturday I picked up the tool that will help make the dig out just a bit easier: a mini excavator. After a quick review of a Youtube video for a similar model, we got the excavator into the basement (I wound up having to take the door jam off) and started digging. The bottleneck is definitely the wheelbarrows. The excavator can fill a wheelbarrow in two buckets, so it took some practice before we worked out a solid system for working efficiently. About the time we’d worked it out, the first dumpster was full and we had to stop.

While we wait for the next dumpster I’ll start clearing out the footings along the wall and get our depth figured out. Up to this point we’ve been winging it, and we don’t want to go too deep! Using the excavator is fun, but I’m still sore from pushing all the wheel barrows of dirt up the ramp. We’re expecting to have three or four dumpsters all told, so this process will probably eat up the better part of a month.

New Basement Electrical

Before we start ripping up the floor of the basement, it made sense to put in the new electric. For one, it’s easier to put in overhead lights with the floor a little higher, but more importantly we want to cut down on work that needs to be done after the floor is done since we’ll be in a hurry to get moved back in. Plus, having good lighting down there instead of some crappy dangling fixtures will make working on the floor a little better. I debated doing the electrical myself, but in the end I just called Percy, our electrician, and he and his assistant Kevin got it done in a few days, where it probably would have taken me a month. Percy will come back after the interior walls are up to add a few more outlets and switches, but this gets us 90% of the way there.

New switches and outlets

New switches and outlets

We went the typical recessed can light route. The ceiling in the basement won’t be very high, so anything that sticks down is less than ideal. I bought a few LED light bulbs to decide what color temperature and style we like before ordering a whole set of them. We settled on the 3000K “bright white” since they’re a nice compromise between the 2700K yellowish “warm white” and the 4000K laboratory “daylight”. The bulbs came out to $12 each, cheap for LEDs, but expensive relative to CFL and incandescent until you consider the operating cost and lifetime. A regular 65W bulb costs $3 and  lasts 1,000 hours. A CFL costs $8, uses 14 watts, and lasts 8,000, while an LED uses only 8 watts and lasts 25,000 hours. Including replacement costs and electricity, every thousand hours of incandescent use costs about $13.85, compared to a CFL that costs $3.38 and an LED that costs $1.82. Since we’ve got nineteen lights just in the basement, the payback is there even vs CFLs. We spent $75 more on LEDs than CFLs up front, but even ignoring that the LEDs last three times longer, the electricity savings will pay that back before the CFLs are half used.

New can lights

New can lights

I was concerned about mounting the switch and outlet boxes on the brick, since even though the metal is galvanized, moisture can corrode it. The old finished basement had some extremely rotted boxes and conduit that we don’t want to recreate. Percy sprayed the backs of all of the boxes before putting them up with a rubberized coating to prevent water contact from the walls. Our hope is that along with improved water management, the electrical will stay dry and last a long time.

Outlet box spray coating

Outlet box spray coating

The plan is to install a foam panel system on the exterior walls that will provide a drainage plane behind the insulation. These systems have raceways for the electrical so we can just fit them over the installed conduit when we finish the basement. That will ensure any water that comes through the brick will be able to drain away and that the wall itself is impervious to water and won’t rot. It’s exciting to see more progress,and to see how much the basement has changed so quickly, especially since I didn’t have to do all the work!

Basement Plan

We’ve worked out our plan for moving into the basement. Part of that is figuring out how we’ll lay out the space, given that eventually it will be an entertaining space, not an apartment. To that end we’ve come up with a way to integrate some temporary bedrooms into the plan without having to change around the walls we want in the finished product.

Basement Apartment Plan

Basement Apartment Plan

In the plan you can see some of the walls are white and some are green. The white walls represent the finished product. We’ll build these walls with the intention of leaving them there. The green walls will partition off some bedrooms and will be temporary (they won’t actually be green). We won’t anchor them to the floor and we’ll take them out as soon as we’re done living there. The top left is where we’ll have a kitchen and laundry space. We’ll put in a utility sink that will serve for the kitchen but we can leave it there for future use. The laundry is there now and it can stay there until we finish the second floor, since it can share the sink plumbing and vent out the back window. We’ll put a counter on top of the washer and dryer to use as a kitchen prep space.

The wall in the bottom right corner is to close off the gas meter, which is a little scary and we don’t want the kids to play around it, hang from it, break it, blow up the house, etc. Eventually, People’s Gas is supposed to move it to the outside, but for now it’s stuck where it is. We may try to come up with something simpler, but this also gives us some closet space, which is otherwise lacking. We’ll set up shelving where we can, but storage will definitely be at a premium.

To get to this point we need the electrical run, the windows replaced, the concrete floor dug up and the foot of dirt removed. Then we start putting stuff in: the interior weeping system, new plumbing (that’s when we have to move out), gravel, rigid foam, wire mesh, PEX tubing for radiant floor heat, and new concrete. With the floor in place we can build the permanent walls and finish the bathroom so we can move back in. Then we put in the sink, build the basement stairs and the temporary walls, and finally move into the basement!

There will be a lot of other projects along the way, some big and some small. Near term I need to install bracing between the first floor joists before the electrical is run, install new lintels over two of the front bay windows, and try to patch some leaks in the gutters to stop water from coming into the basement. We may take the concrete out through the front window to a dumpster on the street, but to remove all the dirt and bring in the new gravel and concrete we’ll tear down the back porch and the garage. We’re also changing the back basement steps including a new retaining wall, and after we lower the floor we need a new back door. Even with some chunks of this work being done by contractors, it’s safe to assume that this will take us most of the year.

Basement Tuckpointing

Before tuckpointing

Before tuckpointing

The next step down the road to getting our basement livable is repointing the brick walls. 120 years of water damage, bad patching, paint, and neglect had left the brick in bad shape. Large portions of the walls had been parged with mortar or concrete, which can trap water in the brick rather than allowing it to dry. We started by chipping off the parging. Some of it was so loose and brittle we could snap chunks off with our bare hands, while other sections came off only reluctantly with a hammer and chisel. About the time I got my rotary hammer back from a friend, I decided we just needed to hire out the job to some professional tuck pointers.

After hammer and chisel

After hammer and chisel

We got a couple of quotes, but wound up settling on Tuckpointing Masonry Systems, who Dean had used and recommended. They came in with a crew and after two days of dust and noise, the basement looked amazing. They ground out all of the mortar below grade and completely repointed it. Above grade they knocked out the loose material and spot-tuckpointed where it was needed.

After tuckpointing

After tuckpointing

The other thing we had them do was to rebuild the sills on the front bay windows. The bay windows are taller than the other windows in the basement, extending down to ground level, which makes them susceptible to water coming in. To prevent this, the tuck pointers installed new concrete sills with flashing. The next step is to re-frame the two angled windows in the bay, since they currently don’t have lintels.

Rebuilt bay windows

Rebuilt bay windows

I’ve requested quotes on new windows and asked Percy, our electrician, to come over and give us a quote on new electrical in the basement, including lights, outlets, and switches. We’ve got a lot of work ahead of us, but once all of that is done we start breaking up the floor!