Tag: bugs

Basement Challenges

There are some downsides to living in a basement (who knew?!). These are amplified when it’s an old basement with brick walls, and even more when said walls have problems with moisture. We’re tackling the drainage project to hopefully address the biggest problem, which is water coming in. However, that isn’t going to solve everything. Because the roof, gutters, and siding are all problematic, water is coming into the brick wall above grade. Worse, the outside of the above-grade brick is parged in concrete, so the water has nowhere to go but inside. The result is humidity, mold, bugs, and brick efflorescence. None of these things is particularly pleasant to live with and none of them are solved by the drainage project. We plan to fix the roof, gutters, and siding, but there are a bunch of dependencies we have to do first, and that’s going to take some time.

Efflorescence

Efflorescence

We’re running a dehumidifier most of the time, as well as open windows and fans. We put a retractable screen door on the back door so we can improve the air flow there as well, but that doesn’t help when it’s muggy and rainy outside. We also picked up a used portable air conditioner from Craigslist on the cheap, but it’s missing some parts and we still have to get it hooked up. Hopefully between the two we can keep humidity under control. On top of that, we have good quality air filters running. We’ve sprayed for bugs a couple of times and picked up some stronger stuff to try on the centipedes. If it doesn’t improve, we’ll call in an exterminator.

We looked into painting the rest of the walls with Drylok, but that would actually make things worse. For one, Drylok is a water barrier, not a vapor barrier, so the moisture would still be coming through, which means it wouldn’t actually stop the efflorescence or humidity. On top of that, Drylok can actually host mold and make that problem worse. The only thing it might help with is closing up the hidey holes the bugs are living in and stop some of the fine brick dust from raining down on the curb.

We could remove the parging on the outside, but we’re pretty sure it wasn’t put up on a great-looking brick wall in the first place, not to mention the damage the parging has done to it since. Removing the parging would mean re-pointing (and replacing) a lot of brick. On top of that, we discovered the color of the face bricks on the front of the house is a rather, um, strong red, and we’re not big fans of it. That means the face brick would either have to be painted (and re-painted every 3-5 years), or replaced, both of which are pretty unappealing. In short, it’s an expensive project that probably wouldn’t actually solve the problem, because the underlying cause is the roof, gutters, and siding.

Since that’s not possible immediately, we’ll need to spray a mold remover/mildewstat/fungicide periodically and try to keep the efflorescence under control by cleaning it and spraying a water/muriatic acid solution. We put some of our wire shelving up against the outside wall, and at a minimum we’ll need to pull it back an inch or two, since as it is the efflorescence is snowing on our food (yuck). We discussed putting something between the brick and the shelf, but we’re concerned about anything that would reduce air flow across the brick and potentially make it easier for mold to grow.

All of that means that, in the end, we’re just living with these problems for the time being. Until we can stop the water from coming in, the basement is going to be somewhat unpleasant. That may rearrange some of the priorities on our project to speed up the outside, but it doesn’t change our immediate next steps: the drainage project and the second floor demo.

Getting Started: Locks, Bugs, and Base Camp

Front door

Right after closing we headed to the house and started work. After taking a bunch of “before” pictures to feature in our various projects, the first order of business was changing the locks. Even though the tenants were gone, we wanted to make sure they stayed gone and with the house empty and us not yet living there, it was important for it to be secure from vandals, squatters, and kids.

I’m a technophile, so I’m planning to eventually have some home automation tech for the lights, security, and HVAC. We bought some Kwikset locks because they sell a line of remote-controllable, combination dead bolt locks that are compatible with Z-Wave. We’d order those right away except they’re pretty expensive. I found one on eBay, but I’m holding off on getting any more for now. They also have a neat “SmartKey” technology that lets you re-key your own locks without having to go to a locksmith. I got those installed on the garage, front and back doors. For now we’ve left the interior front and back doors as-is, and we barricaded the lower back door with a board. If we’d gotten full lock sets for all of the doors it would have been a ton of money, and since we’re not going to have two units anyway, most of it would be a waste once we convert things.

With the disgusting state of the house and the roach infestation we decided to set up base camp in the relatively clean garage. In order to prevent any contamination of our condo, we’re changing clothes there and not bringing anything back with us. We brought, bought, and ordered tools, cleaning supplies, clothes, snacks and got our operations center up and running. We even brought our toaster oven and this weekend our grill so that we can cook food. Sarah’s able to work on the house during the day most days, but I’m at work until the evening. Since our condo is twenty-five minutes away, not having to go back and forth is pretty important.

Our first orders of business were “pre-cleaning” and extermination. Sarah started by getting some of the remaining garbage thrown out and I boarded up the basement windows that were letting rats in and out. In order to get rid of them you have to first isolate them: divide and conquer. Then, anything that the roaches were hiding in and feeding on had to be thrown out. That meant tearing out the carpeting, both kitchens, and taking down some of the trim. Then we removed the tile in the second floor kitchen and part of the first floor. This was much more demo than we’d planned on doing right away.

First floor kitchen demo

There are four “toter” style garbage cans for the house and we’d filled all of them within a day and a half. Once they were emptied we filled them up with a bunch more stuff. Because we’re in a bit of a hurry, we’re taking a multi-pronged attack on the bugs. We’ve used pyrethrin spray cans, boric acid, foggers, and sprayers. We’re killing them in droves, but we won’t be happy until they’re completely gone, and that will take a bit. We set a bunch of baited traps for the rats, but thus far haven’t caught a one.  We’re pretty sure they’re there, but until we’ve got all of the holes sealed they may just be feeding outside. Once they’re stuck and it’s the only thing to eat, they’ll probably go for it.