Tag: digger

Basement Dig Out – Part 3

Sarah using the digger

Sarah using the digger

I’ll be honest; I’m not sure how many “parts” to the dig out there are, but this is Part 3. It kind of feels like it’ll go on forever. We filled our fifth heavy debris dumpster in a row and took back the mini-excavator. I’d like to say that means we’re done, but instead I’m saying that “principle excavation” is complete, which is just another way of saying that we’re not done. What remains to do is finish clearing the dirt from the footings, remove a few piles of loose dirt including the dirt ramp we used to get the digger out the back door, and level everything, probably by renting one of those heavy rollers you fill with water. The bottom line is there’s more than a few wheelbarrows of dirt yet to haul out, and a lot more work to do.

Digging for new back steps

Digging for new back steps

The last thing we used the digger for was to excavate a pit behind the house. This is where the new outside basement steps will go. Having the steps go up to the left makes more sense since it’s toward the sidewalk that runs along the side of the house and to the currently nonexistent garage, but it requires some reconfiguration, by which I mean busting out the existing concrete retaining walls and stairs and then putting in a new one. With the steps going to the left, we can eventually put a deck on the right side of the house.

In addition to the final clearing and leveling, we also need to clean up the inside edge of the footings so that it’s even enough to finish the walls down the road. Exactly how we do that “clean up” remains to be seen, but it’s stone, so probably hammer and chisel, concrete saw, and angle grinder. Of course after everything is nice  and clean and level we have to dig trenches for the plumbing and weeping system, so we’ll be busy for a while yet.

Because we have to take out the concrete walls and there’s undoubtedly more dirt to clear for the stairs, there’s a strong likelihood we’ll need yet another dumpster in the not-too-distant future. Also, just a heads up to anyone planning an extended rental from Home Depot: a “month” is four weeks, so if you bring it back in thirty days it costs extra.

Basement Dig Out – Part 2

Ramp to basement

Ramp to basement

I’ve got this great new workout you should try; it’s called “pushing wheelbarrows full of clay up a steep ramp”. In the last two weeks we’ve filled two 10-yard heavy debris dumpsters, emphasis on the heavy. Tomorrow they swap the full dumpster for an empty one and it starts again, so this is basically our day off. We’re getting one per week and I expect that to continue for the next couple weeks.

Second dumpster filled

Second dumpster filled

Our original wheel barrow was old when we got it and was not up to the rigors of this project.  The bucket tore loose from the frame and we set it aside. Sarah’s dad lent us his wheelbarrow, but it’s looking a little crooked these days. Sarah bought two new wheelbarrows, and between the three we’ve been putting them to use. I hauled 30 loads in two hours Saturday evening. I’d guess each dumpster is about 150 loads, since we can only fill the wheelbarrows about half-full and still push them up the basement ramp. The ramps are working well, though the one up from the basement is the tough one, especially when it gets slick from the rain and mud. The ramp I built to get up to the top of the dumpsters is great, though. That was time well spent.

Digger and wheelbarrows

Digger and wheelbarrows

The digger (mini excavator) has proven its worth too. Every time we grab a shovel to manually dig around the footings we’re given a taste of what the task would have been like without it, and it’s just awful. Digging with the backhoe on the other hand is a breeze. Hauling up bucketfuls of heavy clay, the hardest part is dropping clods into the wheelbarrows without knocking them over (especially the crooked one) and not digging too deep. I used my laser level to confirm the footings are pretty consistent in height, so we just need to dig even with the bottom of them, about 14 inches total.

Excavation

Excavation

Looking forward, we’ve gotten about a third of the dirt removed. With the dumpster we get tomorrow we can get most of the next third removed. That means it will be time to move the water heater and the laundry upstairs so we can pull up the last section of concrete floor. I’m taking off some time from work next week to get that done as well as level what we’ve dug so far. Our goal is to finish with the digger by the weekend after Memorial Day, which includes digging out the new back steps. May’s looking pretty busy!