Tag: digout

Basement Retaining Wall and Footing Curb

We’re still waiting on our plumbers to do the re-lining of the sewer and the new water supply line. They in turn are waiting on approval from the City, which is being difficult. Apparently the connection between our sewer line and the sewer main under the street is damaged, and City is determining whether we need to repair it to do the re-lining.

Interior footing curb forming

Interior footing curb forming

In the mean time Mario, our concrete guy, is going like gangbusters to move things along. We can’t pour the basement floor until the plumbers finish their work, but we can work on the back stairs. After I removed the back steps down from the first floor, he re-dug out the hole we had filled behind the house and knocked out the existing retaining walls. For a rare change, rapid progress was being made without me being directly involved.

Nighttime concrete

Nighttime concrete

Within a couple days, Mario got the forms in for the new retaining wall as well as for a curb around the inside perimeter of the basement, since the existing stone block footings were exposed from the digout. Then, unexpectedly, Tuesday afternoon the concrete truck arrived a day ahead of schedule and Mario and his assistant wound up working until 10pm to get everything poured, smoothed, and cleaned up. Anything ahead of schedule is rare indeed with our project!

Retaining wall, formed, braced, and poured

Retaining wall, formed, braced, and poured

The forms came off the retaining wall yesterday and soon the stairs can be formed. I need to get the drain for the landing outside the back door roughed in and then Mario can get that and the stairs poured.

Completed retaining wall

Completed retaining wall

The forms are still on the footing curb, but you can definitely get a feel for the difference it makes in the basement. It’s really starting to feel like we can get a floor poured and start putting up walls, if the city would just sign off and let the plumbers get to it.

Basement Dig Out – Part 2

Ramp to basement

Ramp to basement

I’ve got this great new workout you should try; it’s called “pushing wheelbarrows full of clay up a steep ramp”. In the last two weeks we’ve filled two 10-yard heavy debris dumpsters, emphasis on the heavy. Tomorrow they swap the full dumpster for an empty one and it starts again, so this is basically our day off. We’re getting one per week and I expect that to continue for the next couple weeks.

Second dumpster filled

Second dumpster filled

Our original wheel barrow was old when we got it and was not up to the rigors of this project.  The bucket tore loose from the frame and we set it aside. Sarah’s dad lent us his wheelbarrow, but it’s looking a little crooked these days. Sarah bought two new wheelbarrows, and between the three we’ve been putting them to use. I hauled 30 loads in two hours Saturday evening. I’d guess each dumpster is about 150 loads, since we can only fill the wheelbarrows about half-full and still push them up the basement ramp. The ramps are working well, though the one up from the basement is the tough one, especially when it gets slick from the rain and mud. The ramp I built to get up to the top of the dumpsters is great, though. That was time well spent.

Digger and wheelbarrows

Digger and wheelbarrows

The digger (mini excavator) has proven its worth too. Every time we grab a shovel to manually dig around the footings we’re given a taste of what the task would have been like without it, and it’s just awful. Digging with the backhoe on the other hand is a breeze. Hauling up bucketfuls of heavy clay, the hardest part is dropping clods into the wheelbarrows without knocking them over (especially the crooked one) and not digging too deep. I used my laser level to confirm the footings are pretty consistent in height, so we just need to dig even with the bottom of them, about 14 inches total.

Excavation

Excavation

Looking forward, we’ve gotten about a third of the dirt removed. With the dumpster we get tomorrow we can get most of the next third removed. That means it will be time to move the water heater and the laundry upstairs so we can pull up the last section of concrete floor. I’m taking off some time from work next week to get that done as well as level what we’ve dug so far. Our goal is to finish with the digger by the weekend after Memorial Day, which includes digging out the new back steps. May’s looking pretty busy!