Basement Challenges

There are some downsides to living in a basement (who knew?!). These are amplified when it’s an old basement with brick walls, and even more when said walls have problems with moisture. We’re tackling the drainage project to hopefully address the biggest problem, which is water coming in. However, that isn’t going to solve everything. Because the roof, gutters, and siding are all problematic, water is coming into the brick wall above grade. Worse, the outside of the above-grade brick is parged in concrete, so the water has nowhere to go but inside. The result is humidity, mold, bugs, and brick efflorescence. None of these things is particularly pleasant to live with and none of them are solved by the drainage project. We plan to fix the roof, gutters, and siding, but there are a bunch of dependencies we have to do first, and that’s going to take some time.

Efflorescence

Efflorescence

We’re running a dehumidifier most of the time, as well as open windows and fans. We put a retractable screen door on the back door so we can improve the air flow there as well, but that doesn’t help when it’s muggy and rainy outside. We also picked up a used portable air conditioner from Craigslist on the cheap, but it’s missing some parts and we still have to get it hooked up. Hopefully between the two we can keep humidity under control. On top of that, we have good quality air filters running. We’ve sprayed for bugs a couple of times and picked up some stronger stuff to try on the centipedes. If it doesn’t improve, we’ll call in an exterminator.

We looked into painting the rest of the walls with Drylok, but that would actually make things worse. For one, Drylok is a water barrier, not a vapor barrier, so the moisture would still be coming through, which means it wouldn’t actually stop the efflorescence or humidity. On top of that, Drylok can actually host mold and make that problem worse. The only thing it might help with is closing up the hidey holes the bugs are living in and stop some of the fine brick dust from raining down on the curb.

We could remove the parging on the outside, but we’re pretty sure it wasn’t put up on a great-looking brick wall in the first place, not to mention the damage the parging has done to it since. Removing the parging would mean re-pointing (and replacing) a lot of brick. On top of that, we discovered the color of the face bricks on the front of the house is a rather, um, strong red, and we’re not big fans of it. That means the face brick would either have to be painted (and re-painted every 3-5 years), or replaced, both of which are pretty unappealing. In short, it’s an expensive project that probably wouldn’t actually solve the problem, because the underlying cause is the roof, gutters, and siding.

Since that’s not possible immediately, we’ll need to spray a mold remover/mildewstat/fungicide periodically and try to keep the efflorescence under control by cleaning it and spraying a water/muriatic acid solution. We put some of our wire shelving up against the outside wall, and at a minimum we’ll need to pull it back an inch or two, since as it is the efflorescence is snowing on our food (yuck). We discussed putting something between the brick and the shelf, but we’re concerned about anything that would reduce air flow across the brick and potentially make it easier for mold to grow.

All of that means that, in the end, we’re just living with these problems for the time being. Until we can stop the water from coming in, the basement is going to be somewhat unpleasant. That may rearrange some of the priorities on our project to speed up the outside, but it doesn’t change our immediate next steps: the drainage project and the second floor demo.

Basement Progress Update

We’ve been busy in the basement! So busy, in fact, that I haven’t been doing a good job of posting about it, nor even taking all the photos that keep the posts from simply being my long-winded explanations of why everything takes so damn long. So, in the interest of getting everyone caught up to where things are, I’m doing a catch-all post on the flurry of basement activity. My last update was August 5th, but the work it described took place in mid-July, so we’re actually a quite a bit behind. Let me jump to current though, and say we met our deadline of August 20th, and we are living in the basement. I’m actually typing this while sitting in the living room of the basement at an actual desk.

So, a lot has happened since we mudded the permanent basement walls. We got the permanent walls painted, the tub tiled, grouted, and caulked, and the bathroom and kitchen cabinets installed. That let us call back our plumbers, who got the finish plumbing done and reconnected the water heater in the basement. With that goal met, we framed and drywalled the temporary walls. These walls create bedrooms in the basement while we’re living down here, but once the rest of the house is done we can take them down and the main area of the basement can be finished as an entertaining space. We didn’t bother mudding this drywall, but we did paint it. I installed the interior doors, which included three doors in the permanent walls (bathroom, mechanical room, and between the front and back rooms), and two bedroom doors in the temporary walls. We cased the doors as well as the window in the kitchen.

I installed the medicine cabinet in the bathroom, along with the additional bathroom lighting. When we tiled, we installed a metal track at the top of the tub wall and ran a strip of adhesive LEDs along it. These are connected to an additional strip above the mirror and hooked up to a power supply inside the top of the medicine cabinet, which is switched on the same circuit as the overhead light. The tracks are covered by a snap on plastic diffuser. We’re pretty pleased with how this turned out. All of it is either waterproof or wet-rated, so the shower shouldn’t cause any issues.

In the kitchen we installed a butcher block counter with a single basin sink (Amazon literally sold us the kitchen sink). The sink was originally going to be under-mounted, but there wasn’t enough room for the clips inside the base cabinet. Since the sink can be mounted either way, I opted for top mount, but routed the top of the counter so that it sits flush, making it easier to wipe the counter into the sink. My measurements didn’t properly account for the curb when I bought the cabinets, so we built a wooden frame for them to sit on top off. This puts them about 4″ taller than typical, but we’re tall and it works for us. I also didn’t properly account for the dishwasher height being greater than the cabinets minus their feet, and had to retrofit the frame with reciprocating saw, oscillating tool, planer, socket wrenches, and additional 2x6s. The dishwasher is installed, and I never want to think about it again.

 

We painted the curb and the bottom foot of the wall with Drylok waterproofing paint. I’ve read a lot about building science and don’t want to seal brick, but despite our exterior water management efforts and interior weeping system, we’re still getting water coming through the walls on heavy rain. By only painting the concrete and the brick below the frost line, my hope is that water will be forced down into the weeping system, but won’t freeze within the brick and damage it. Having a radiant-heated slab should also prevent freezing. It’s been raining enough that the Drylok wasn’t able to dry fully. I bought some additional waterproofing putty for active leaks that I still need to install.

I put up privacy film on the window along our neighbors walkway, put pipe insulation on the incoming water line to prevent condensation, added a light switch in the mechanical room, ran a gas line for the stove, put up shelves, moved the phone line for our Internet connection, put up a shower curtain rod, swapped our mud rings for metal electrical box covers, painted the old part of the gas line before the meter and mounted it to the wall. Sarah hung shades, scrubbed, mopped, and scraped the floor, and watched our two rambunctious children while I spent countless nights either in the basement or running to Home Depot and Menards. Sarah’s parents, her brother-in-law, and her brother all pitched in with assistance on trim, painting, the cabinets, the door handles, and brushing down the walls. My mom came up multiple times to watch the kids so Sarah and I could both do tiling and painting. Dean and Matt B came to help us move last weekend, and while there’s still a ton of stuff upstairs to be sorted and packed into storage, we’re moved. We couldn’t have made the deadline without all their help and we’re very grateful for it. Without the deadline fixed in our minds, this easily would have taken an additional month or two, and I’m so glad it didn’t. We lived in the second floor for five years (exactly). Considering we wanted this to be a five-year project, considering we shifted to the basement plan in November of 2014 (21 months ago) and planned for it to take about a year, and especially considering how very far we still have to go to finish this crazy house, I’m relieved.

Living room, before furniture

Living room, before furniture

We’re planning to relax a bit, but we still have a lot to do, just to get the basement situated (and not leaking) and to get the second floor ready to demo. The next couple weekends are relaxing (going to the beach and going camping), but hopefully after that we can get settled and start on the next exciting, exhausting, and endless phase of this project.