Tag: steps

Back Basement Steps

Formed steps

Formed steps

Our concrete mason, Mario, was back this past Saturday building the forms for the stairs. He pointed out that the basement drain we put in was too high. Somehow, between the time we put it in and when he came by it had lifted by about an inch, which I confirmed with the laser level. Since I needed to adjust it anyway, he asked if I could center it in the landing because it would be easier for him to slope the landing to it. That meant not just shortening the length of pipe, but adding an elbow that I fortunately already had.

Drain reposition

Drain reposition

I got that taken care of Saturday afternoon, and Mario was back on Monday to do the pour. He wound up tenting the whole operation with a tarp to keep out the rain. Yesterday he came back out to remove the tarp, clear the forms from the basement footing curb, and make sure everything looked good. We’re pretty happy with the finished results, and we plan to bring him back to pour the basement floor once the plumbers finish their work. If you need a concrete mason in the Chicago and Northwest Indiana area, we recommend MG Concrete.

Finished steps

Finished steps

It was snowing this morning when I snapped a photo of the finished stairs. I need to check the basement and see if the drain is working. I also plan to grind down the bit of footing stone that is proud of the landing by a couple inches so we don’t have a tripping hazard. Hopefully I can get some photos of the finished footing curb as well.

New Temporary Back Steps

After I took down the back porch steps so our concrete mason could put in the new retaining wall, we were left with no way to go out the back of the house. Since we park the car in the back that wasn’t ideal. 

Stringers attached

 

With the new retaining wall in I decided it was time to remedy the situation. We aren’t going to have our new deck for probably a couple of years, so I wanted something semi-permanent but still fairly cheap and easy to put together.

Completed stairs

 
I settled on pre-cut pressure treated stringers and 2x10s but only 24″ wide between the railing. Since our back sliding door is already pretty narrow, this works fine.

Back Steps Demo

Back steps

Back steps

This project was a quick one, but it portends bigger progress afoot. When we took down our back porch we left the stairs from the first floor down to the ground and the steps from there down to the basement. In fact, I shored up the structure underneath it, Matt B and Dean built a railing for it, and Sarah and Matt B cut a new piece of plywood for the floor of it, all so we could have usable back steps and a way to get from inside the house to the back yard. After I took out the concrete steps that led into the basement to make the ramp, the wooden porch steps to the side remained as a safer way to get in and out of the basement. Well, this past weekend I demolished the back steps.

Demo in progress

Demo in progress

This is in preparation for the new concrete retaining wall and steps that will lead from ground level down to the basement. We’re replacing the existing retaining wall and steps because we want to put a deck on the back of the house, which means the stairs need to go to the left instead of straight or right as they do now.  It actually makes more sense to go to the left anyway, since that’s the side of the house that has the sidewalk to the front.

Steps removed

Steps removed

Once the new wall and stairs are in place, we’ll build some temporary stairs down from the sliding door, since we won’t have the deck for some time. In the mean time we’re going around to the front or climbing in and out, sometimes with the help of a step-ladder. Hopefully the concrete guy will be starting in the next few days and we can get the temporary stairs built in the next few weeks. The plumbers finally started yesterday and I met with some tuck pointers that should be able to fix up the basement door and window openings in a couple of weeks, and last night we picked up the new exterior door for the basement, so we’re making progress on a few fronts.

Basement Dig Out – Part 3

Sarah using the digger

Sarah using the digger

I’ll be honest; I’m not sure how many “parts” to the dig out there are, but this is Part 3. It kind of feels like it’ll go on forever. We filled our fifth heavy debris dumpster in a row and took back the mini-excavator. I’d like to say that means we’re done, but instead I’m saying that “principle excavation” is complete, which is just another way of saying that we’re not done. What remains to do is finish clearing the dirt from the footings, remove a few piles of loose dirt including the dirt ramp we used to get the digger out the back door, and level everything, probably by renting one of those heavy rollers you fill with water. The bottom line is there’s more than a few wheelbarrows of dirt yet to haul out, and a lot more work to do.

Digging for new back steps

Digging for new back steps

The last thing we used the digger for was to excavate a pit behind the house. This is where the new outside basement steps will go. Having the steps go up to the left makes more sense since it’s toward the sidewalk that runs along the side of the house and to the currently nonexistent garage, but it requires some reconfiguration, by which I mean busting out the existing concrete retaining walls and stairs and then putting in a new one. With the steps going to the left, we can eventually put a deck on the right side of the house.

In addition to the final clearing and leveling, we also need to clean up the inside edge of the footings so that it’s even enough to finish the walls down the road. Exactly how we do that “clean up” remains to be seen, but it’s stone, so probably hammer and chisel, concrete saw, and angle grinder. Of course after everything is nice  and clean and level we have to dig trenches for the plumbing and weeping system, so we’ll be busy for a while yet.

Because we have to take out the concrete walls and there’s undoubtedly more dirt to clear for the stairs, there’s a strong likelihood we’ll need yet another dumpster in the not-too-distant future. Also, just a heads up to anyone planning an extended rental from Home Depot: a “month” is four weeks, so if you bring it back in thirty days it costs extra.