Momentum

We put in the last two bay windows last week, meaning all of the first floor windows are in, aside from the sliding door that we have to hold off on. I need a few more strap anchors and some more flashing tape to call the last window done, and we still have to go around with the Great Stuff and backer rod to complete the air sealing. In addition, Lester, our radiant heating guy, finished the rough-in work ahead of our new boiler installation. It’s been a lot of work but it’s also a very tangible feeling of progress that we’re eager to keep up.

Derek helping

Derek checks for square

Our next major goal is to get the new subfloor installed. We need that done in order to start a whole host of first floor projects like framing interior walls, building the new stairs,  insulating the exterior walls, and getting the radiant floor heating installed. With the weather getting colder day by day, it’s those last two in particular that have our interest piqued.

With so much riding on the subfloor, and the time required to level the wonky floor joists, we’ve decided to hire it out. I’m working on getting quotes this week and hopefully we’ll get some good numbers and people. We’ll need to set to work clearing out the first floor. It’s accumulated an impressive pile of scrap wood from the removing the old windows, plus the giant steel pallet the door shipped on, the sliding glass door we can’t install yet, and all of our tools.

The other thing standing in the way of new subfloor is the radiators, steam pipes, and chimney from the old boiler. The old boiler is disconnected, and so far we’ve been making do with electric heaters. We’ve been reluctant to remove it because it’s still a viable way to heat the house if the new boiler takes longer to show up than the freezing weather.

In short, we’ll get started clearing things out and see how things play out. Hopefully we’ll get our new boiler in quickly and the chimney and pipes will come down before they’re in the way of the subfloor contractor. Worst case, we’ll have to hook the old boiler back up and the contractor will have to wait or work around some things. Either way, things are moving and we’re getting excited.

More First Floor Cleanup

This is going to be a picture-heavy post. To start with, I got the partition walls on the first floor down. That really opened things up (and made the house sway a bit in heavy winds, which is concerning). I removed the pocket door mechanism whole by taking down the long board the four pieces are mounted on. We’re going to try selling it to a restoration shop, since we don’t have a place to put it.

Walls removed

You can see our massive lath collection on the left. Progress continues removing the plaster from the wall cavities. It’s time consuming but it’s getting done bit by bit. It’s still a big dusty mess, and I come up from working on it looking like a coal miner.

Bedroom floor cleanup

Here’s a view looking toward the front in the bedrooms. Again, the partition walls separating the bedrooms and closet have been removed (except for the room full of lath that you can see at the end). With help from Matt and Will I pulled up the floor in the back bedroom. Tonight I pulled up the remaining bedroom floor. You can see the subfloor planks in the foreground and the hardwood in the back.

Debris

We carefully separated and de-nailed all of the old wall studs and put them in the basement for later use. The rest is thin pieces that were used to edge the doors and cap the wall studs, which unfortunately has a tendency to crack and split when we pull out the nails. I’m not sure it’s worth saving.

Filthy

I don’t think I can understate what a mess it is. The original floors were installed over felt paper and cross boards to float them so they wouldn’t pop with the temperature swings. This created a cavity under the floors that is basically full, both with the plaster dust from demo as well as a hundred years of regular day to day living. I’m fairly sure we’re going to need another dumpster,  albeit a smaller one than before. I’m looking forward to a step in this process that doesn’t involve a shovel.